SE-MI Technology, a.s. Static assessment of the steel structures of the sorting line of the material extracted from the Heřmanice mining in Ostrava (CZ)
TMETAL s.r.o. Dynamic frame for rock crushing machine, assessment including fatigue analysis and foundation – Sweden
TMETAL s.r.o. Rotating and tilting bridge for material transport – construction of the Brenner Tunnel