ČEZ, a.s. Analysis of crack initiation on the wheel of the N1250x50-A/II landfill machine in Dětmarovice (CZ) Power Plant
TMETAL s.r.o. Rotating and tilting bridge for material transport – construction of the Brenner Tunnel
SE-MI Technology, a.s. Static assessment of the steel structures of the sorting line of the material extracted from the Heřmanice mining in Ostrava (CZ)