ČEZ, a.s. Static assessment of the steel structure of the smoke ducts behind the electro separator of boiler K16 in the Prunéřov Power Plant (CZ)
SE-MI Technology, a.s. Static assessment of the conveyor bridge and the biomass handling station at the Poříčí Power Plant (CZ)
TMETAL s.r.o. Rotating and tilting bridge for material transport – construction of the Brenner Tunnel